NexSens 918M Deployment Pipe Assembly

The 918M deployment pipe assembly is for deployment of instruments with up to 8" diameter. It threads directly into a pass-through port on the CB-1250 data buoy with locking cover for secure topside access. It is constructed of Sch. 80 PVC with inner diameter approx. 192 mm and overall length of 81 cm.

kr9.955,00 eks. mva

Typical delivery time 3-4 weeks from order.
Note: Quantity discounts available starting at 2 units. Send Quote Request for best pricing.

The 918M deployment pipe assembly is for deployment of instruments with up to 8" diameter. It threads directly into a pass-through port on the CB-1250 data buoy with locking cover for secure topside access. It is constructed of Sch. 80 PVC with inner diameter approx. 192 mm and overall length of 81 cm.

Related products

Recently viewed